Saturday, December 1, 2012

December Planning

THERE WILL BE NO PLAN -!!!

But I do have the following on the needles that will get picked up and worked on as the mood strikes!


  • OWL sweater - colorwork cardigan with about 10 hours remaining
  • Brown Sweater (started in October) - about 40 hours remaining
  • Mario Hat - duplicate stitching remaining - about 4 hours
  • Teddy Bear - 90% of him remaining - about 8 hours of work
So, I wouldn't mind finishing the last two of those. But the first two will get finished to the last end woven in and trimmed - so that I can turn them in for future WIPtheFirsts.

Christmas knitting that I haven't started yet and will probably do this month... though if I don't there won't be anyone applying any guilt (best and only type of Christmas knitting I will do).
  • Christmas ornaments for my family and Alex's teachers at school
  • Red scarf for my future daughter-in-law
Since it'll be the new year around the corner.... there is also one last WIP that hasn't gotten a mention all year.... the hibernating project, the dreaded alligator. About 20 hours of knitting remains on him. And it's down to the nit-picky little bits. Not much to do, but it's all down to somewhat fiddly and fussy. But he's been hibernating for about 18 months and I would like to finish him. If I can get him to within 99% of done, he can be an AWESOME WIPtheFirst in the future.

I will pick out a blanket project, order yarn and knit a swatch for the New Year at some point this month. 

November EOM Progress

ARRRGGG! Again, I didn't manage to finish my OWL.

The Hat Time Trial followed by the enui that followed it, cost me. I knew it was going to be close and the OWL was the only thing I worked on for the full last week of November (sadly this includes housework, so, um, yeah - now I get to clean house today - lol!).  By Friday at noon, all I had left was the button-less button band. Approx. 93" of 22 stitches of K2, P2 Ribbing. I did 3" during my 30 minutes of lunch, getting me to 38". Which left me with 57". At 3" in 30 minutes, or 6" in 1 hour.... that would be 9-ish hours of knitting left... plus seaming and weaving in the final ends - so approx. 10 hours. I was only going to have 8 hours left before HPKCHC end of term.

SO CLOSE. SO DARN CLOSE.

But, if I wasn't going to finish, I wasn't going to stay up all night trying to finish.

So, instead... I tried to tackle some of my other class ideas.

COMPLETED:
1 mochimochi snowman

This took a LOT longer than I anticipated and I had a lot of trouble with it. I didn't have any fingering weight white yarn to use - so I used sport, but same size needles recommended (even though I'm a loose knitter -with the idea larger yarn would compensate).  It's certainly cute. And my son claimed it 2 seconds after I finished it. But I will most certainly NOT be making more like this. I might end up trying to see how big they end up with worsted weight yarn on size 3... but if it's as fiddly to start as this is? I probably will come up with a different ornament to make for my son's teachers at school.

Previously posted:
41 hats
2 cowls

ON THE NEEDLES:

My so-close OWL
This is a shot of the body being blocked pre ends woven....
















Here's a close up on the colorwork, for a night shot, it's actually somewhat true to the color.











The Mario Hat (hat is finished, just none of the duplicate stitching yet):


And lastly, one little leg (all alone) of a teddy bear:


I also had my TKGA Master Knitter Level 1 hat to start... but it was 10:30 pm, I was tired... and that is NOT the time to try to start a master knitter project.

I may sigh and whine about what I didn't finish. But, honestly? I got a TON done this month. I just need to remember that being a single mom working two jobs? No matter how cupper-crazy I may be, I have boundaries and it's ok. Because... lookie what I did get done!  Seriously? I have a lot to be proud of, you know?

So, my plan for December is to rest and recharge! There will be knitting. And there will be FO's posted. But they will be whatever they will be based on motivation and moments. And no official plan.

Friday, November 30, 2012

Reviewing my 2012 goals for the year

Here were my original goals:

  • 12 sweaters/tops - for me - in 2012
  • 40 hats for homeless charity
  • two baby blankets for Project Linus by April 1st
  • whatever else comes my way through Dumbledore's Yarny

So, how did I do? 

  • I finished EXACTLY 12 sweaters / tops for me.

I started 2 that I didn't get finished, one is SOOOO close (the colorful cardigan that was my OWL this term). But I just realized it needs 10 hours of work. I have 8 hours between work ending and the end of term at 2:00 AM CST tonight.

I will probably get it down to the last end to weave in (and probably wear it that way - lol) and weave in the final end for WIPFirst in January.

The second one is the brown one I got about 33% done in October. I'll probably pick it back up after my Christmas knitting is finished and it can be a WIPFirst in February.

I also knit a dog sweater and a kid sweater... so all-in-all, not too shabby.

  • I finished EXACTLY 90 hats for Homeless/charity knitting
Woot! I figured that with the extra effort to do more sweaters I wouldn't have time for lots of hats (my goal last year was 100, and I knit 101 because I'm not good at counting, apparently).

Technically, I would have stopped at 40 if it weren't for the mega-Quidditch point options this term... and technically, if I had stopped at fewer hats, I probably would have finished my OWL sweater. so, yikes. But, in the end, there were a TON more points form the hats than the 13th sweater - even if it was an OWL.


  • two baby blankets for Project Linus by April 1st

I actually finished four baby blankets. Sadly, the only Project Linus drop-off place in the area was no longer affiliated with that project. But they still went to a good charity and they are still now available for keeping babies warm.

  • whatever else comes my way through Dumbledore's Yarny

They never put any more challenges out for this... so technically, I got all of the challenges met (lol).

But that said, ten of my charity hats were for Click for babies. There were two Animal Rescue cat blankets taken to a shelter. There were three scarves and three cowls made for a winter clothing drive for the homeless.

So, while I might not have been able to stick to the letter of the goal, I sure did stick with the meaning behind it.

I will probably do a couple more charity projects for Christmas presents, but there won't be much more added to my achievements for 2012. And I'm ok with that. I've felt a bit mojo-less post-Hat Trials earlier this month and I'm going to try to take it pretty easy on the knitting front starting tomorrow. (Tonight, I'm hoping to squeeze out one more small project and a couple of partials for some last minute points.)

Thursday, November 29, 2012

Cleaning out stash

My wool allergies have gotten a LOT worse.

So, about a year ago I got rid of a ton of lower-quality 100% wool balls by shipping off a box to a random number drawing from asking folks if they wanted it within the Gryffindor house. Some of it got used for an OWL - how awesome is that?

But some of the nicer, expensive yarns I didn't feel comfortable gifting quite the same way. And I had thought about donating them as prizes in Gryffindor... but wasn't sure about that. So, instead, I listed them on Ravelry in Stash to be traded/sold.  They've been sitting there for a good year. It's not like there's a lot of yarn there... just one or two balls of different quality/type/etc. Some of them I did use to trade for the last Cleaning Wars prizes; and a couple of more are slated to go in teh next Cleaning Wars prizes sometime next month.

But what surprised me is that I've actually sold two of them, like within a week of each other.

It's not a lot of money - just $8. But hey. It's $8. AND I get to get rid of more wool from my house. How cool is that?!

My goal for next year is to eliminate all wool from the house as lately? Literally picking up the skein and moving it to another place with wool? Makes me break out in hives. It's got to be eliminated. So, I figure in January I'll decide what's decent enough to contribute as a prize. What's not will probably get thrown into a 'grab bag'... and I'll probably pick someone from my pride to send it as a random act of kindness.

Monday, November 26, 2012

Cyber Monday Yarn Shopping

Quite a few online stores are having cyber Monday sales today. Quite a lot of them are offering 25% off or 30% off or even 40% off.

But so far? The deal that I couldn't resist?

Knitpicks.com

Select yarn and tools are 50% off. And their prices are usually very reasonable to start with.

I had at one point two sweaters-worth quantity of yarn in my shopping cart. But only one of the yarns was at 50% off. So, I ended up deciding to move the non-sale priced yarn into my wish list instead.

So what did I get? I got enough sport-weight baby alpaca in a Heathered Indigo to make a sweater. Easily $150 worth of yarn (bought elsewhere); worth $100 at Knitpicks not on sale;  for $49.50.

Saturday, November 24, 2012

FO's - Julee's cowl

A co-worker had bought one of the charity hats originally intended for the homeless shelter... she plucked it right out of the donation box. I tried convincing her otherwise, but she insisted. I agreed for the sole reason that I could take the money to buy mittens/gloves for children for the donation box with the proceeds.

BUT THEN she proceeded to declare that she needed a matching cowl. sigh. I hate making things on 'command'. And it's for charity... which means more gloves and mittens... which should be a good thing. But, it didn't help much.

This should have taken only about two to three hours to make, max. It took about ten. It got frogged at least four times. But I finally finished it yesterday.

It doesn't help that it's made with Wool Ease Thick and Quick... which is a wool blend. Which I'm now pretty allergic to. I'd been able to work with it before; but after the Hat Time Trials a couple of weeks ago... not so much any more. Now, it's triggering my allergies to even pick up wool, let alone knit with it. (but it had to match - she said - sigh).

This cowl was knit with me taking my benedryl each time I picked it up to work on it.


Friday, November 23, 2012

November - mid-month Progress post

Ugh. Definite lack of mojo going on around here. This past week has been disappointing.

But here goes.

I posted last week that I exceeded my goal of 30 charity hats and managed 40 instead.

My OWL?  I'm onto the sleeves!  I still have a ton of work to do and not nearly enough time.




FO:

Ancient Runes - Changed my mind to do an infinity COWL with my corn yarn.



A new project I cast on for History of Magic - in honor of the booby... A bulky weight cowl for a co-worker who bought a charity-intended hat and wanted a matching cowl. I used the proceeds of the sale for mittens and gloves for the clothing drive.  And of course, because it has to match - it's in a wool-blend which means I can only work on it for a little while at a time. AND of course, because it's a paid order - it's not going well and I've had to frog it multiple times - and need to frog it again... sigh.

Not started yet:

Muggle Studies - assignment is to craft something inspired by games - a Mario hat for my 9 yr old son.

Headmistress Challenge - create swatches on the knook.

Charms - craft something to reflect a favorite season - a handful of mochimochi snowmen

Potions - that stubborn old TKGA Master Knitters hat that I keep procrastinating working on.

Flying - craft something inspired by a flyer - teddy bear....

Yeah. sad, I know. I knew that I'd have trouble making everything I wanted this month... but I didn't expect so much trouble with knitting mojo after that hat time trials.